After the successful completion of the borehole and with water available plenty to start the project, we started locally with the fabrication of bricks. Some 2.000, to be able to start with fencing and to build an outbuilding for placement of controllers for the water supply and electricity.
So recently we started digging the foundation trenches for the fence after which the secretary of the local Kutejumbulu/2BaB Foundation completed the first brick laying ceremony. At the same time the guys for Nawec placed the electricity pole, which they connected to the grid. Later when the outbuilding is ready we will install the electricitymeter and place a water tower with tank on its roof.
After these preperations and with water available plenty, the masoners started their work on the fence. Before the rain really starts we want to finish this wall, the outbuilding en dig the septic tank and proceed with clearing the land during the rainy season.
This project is (and was) carried out with the cooperation of the National Commission for International Cooperation and Sustainable Development; The NCDO, Wilde Ganzen, ASN Foundation and many other foundations, businesses, organizations and individuals.